Write Only Log for 21 Oct 2025 - osric.uk

Belt can carry 30 items/sec.

Green circuit uses 3 cables in 0.5 sec, so 6 cables/sec.

Therefore max green factory per belt is 30/6 = 5.

Cable factory makes 2 cables in 0.5 sec, so 4 cables/sec.

Therefore need 30/4 = 7.5 cable factories to keep 5 circuit factories busy.

Green circuits also uses 1 iron in 0.5 sec, or 2 iron/sec, or 10 iron/sec for 5 factories.

30 iron/sec can feed 15 circuit factories.

Cable needs 2 copper/sec for 4 cables/sec, so 30 copper/sec can also feed 15 circuit factories.

Conclusion: Two red belts, one each of copper and iron can make 30 cables/sec from 15 circuit factories and 22.5 cable factories.

To remember your current position in the blog, this page must store some data in this browser.

Are you OK with that?